January 2024, EDF released a consultation on replacing the Acoustic Fish Deterrent with a salt-marsh. This was widely criticised by both the local public and the environmental community as the AFD is UK best practice, already part of the plans, and based on three decade old technology.
It also goes against the decision made by the Secretary of State for Business, Energy and Industrial Strategy back in 2022, when the government made a final decision to reject EDF’s appeal to remove the Acoustic Fish Deterrent (AFD) from Hinkley Point C.
In simple terms, this means that the government has ruled against EDF’s application and expects the fish protection measure to be installed as initially proposed.
The public inquiry held in 2021 saw EDF argue that the AFD’s removal would not adversely affect the local ecosystem. However, evidence from Fish Guidance Systems, environmental organisations, and the Environment Agency countered this, demonstrating the potential adverse effects. The inspector concluded that a precautionary approach was necessary, recommending that the inquiry should not favour the appellant.
At the time, Dr. David Lambert, Managing Director of Fish Guidance Systems, stated, “The ruling means that there now needs to be a positive outcome, and in the coming weeks, we will contact EDF to discuss how our expertise can help ensure the DCO is met.”
During the inquiry, both Dr. David Lambert and Dr. Andy Turnpenny provided evidence, and the inspector responded:
A public inquiry was held in 2021, where EDF had stated they wished to remove the AFD as it would not adversely affect the local ecosystem. To counter this claim, the inspector heard evidence from a variety of experts, including Fish Guidance Systems and the Environment Agency who stated that there would indeed be an adverse effect.
The inspector stated that
The inspector stated that “In view of the considerable uncertainties in the appellant's fish prediction and assessment methods, and of future changes in fish community composition within the Severn Estuary and Bristol Channel, a precautionary approach is needed and hewould urge the Inquiry NOT to find in favour of the appellant.”
This assessment was seconded by the Department of Environment, Food and Rural Affairs and the appeal was rejected.
Dr David Lambert, Managing Director of Fish Guidance Systems stated “The ruling means that there now needs to be a positive outcome, and we are contacting EDF in the coming weeks to see how our expertise can help ensure the DCO is met”.
During the inquiry both Managing Director Dr David Lambert and Dr Andy Turnpenny, provided evidence and the inspector responded as such:
“8.58 At the outset of the Inquiry we were treated to witnessing the criticisms of Dr Turnpenny and Dr Lambert, imputing that they had some personal financial motivation for giving the evidence in the way that they have to this Inquiry. Their evidence was that the AFD system was practicable and effective. This is exactly the same position that both have advanced for many years before this Inquiry. Dr Turnpenny, as the Inquiry has already heard, was part of the team that designed the LVSE – it is not Dr Turnpenny’s and Dr Lambert’s position that had changed.
8.59 Any interested bystander might have half-expected some follow-up questions to deal with Dr Turnpenny and Dr Lambert‘s assertion that the appellant has failed to get in touch with them to consider the latest technological options, with information from other suppliers of such equipment acquired as part of the appellant’s thorough investigation of this issue. There was nothing other than an acceptance by Dr O’Donnell that since 2017 he had spoken to one company and an unnamed person that worked in the sector who told him that there would be difficulties. It doesn’t appear that any serious and diligent attempt has been made to overcome the alleged technical problems.
8.60 The simple fact behind those criticisms of these two Doctors, both of whom are scientists, and many of whose papers are relied on in the appellant’s own case, is that Dr Lambert’s company is one of a number of suppliers of this type of technology. They were not guaranteed to gain from adopting this stance at the Inquiry, a stance that is consistent with their research and writing over many years. If one is to level charges of financial gain, ironically the only party guaranteed to have a financial benefit from not supplying and maintaining the AFD equipment over the 60-year period of operation of HPC is the appellant.
8.61 What is also apparent is that the appellant has chosen not to conduct proper research to support their application. They have then criticised the Agency’s best efforts to work with the paltry offerings, relying on the lack of detail and uncertainty that creates to try and support their own position. The appropriate authority has a legal duty to base the decision on up-to-date information. Where there is insufficient information and uncertainty, a proper application of the tests means that the proposal should be rejected.”
Our Latest Acoustic Fish Deterrent News
The Benefits of Using Acoustic Fish Deterrents at Nuclear Power Plants: Insights from Doel Nuclear Power Station
Acoustic Fish Deterrent systems have been used at coastal power plants for nearly thirty years. Operated by Electrabel,the Doel Nuclear Power Station, situated on the River Scheldt near Antwerp, Belgium, comprises four pressurised water reactors (PWRs) with varying capacities. The Acoustic Fish Deterrent (AFD) system is installed exclusively on the
An Assessment of Replacing the Acoustic Fish Deterrent (AFD) with a Nature Reserve at Hinkley Point C
The debate surrounding the potential removal of the Acoustic Fish Deterrent (AFD) at Hinkley Point C raises significant environmental concerns. In its consultation early this year, EDF Energy, the operator of Hinkley Point C suggested replacing the AFD, an essential and governmentally mandated technology, with a salt marsh. This suggestion
Exclusion of Welsh Councils from Hinkley Point C Consultation
The latest consultation on the development of Hinkley Point C, the nuclear power station project in Somerset, has notably excluded several Welsh Councils from its list of consultees. This comes despite Cardiff’s proximity to the site, which is less than 20 miles away. EDF, the French owned company behind Hinkley
ROV improvements and innovative thinking the key to Acoustic Fish Deterrent
Fish Guidance Systems has presented a detailed argument advocating the use of Remotely Operated Vehicles (ROVs) to address safety concerns in the maintenance of Acoustic Fish Deterrent (AFD) systems at Hinkley Point C. It has previously presented this at Environment Agency, Welsh Government and UK Government Public Inquiries, the latter